Case Study - MEP BIM Coordination Services For W.R Peck Middle School Holyoke, MA

MEP BIM Coordination services W.R Peck Middle School Holyoke

Project Overview

Client Profile

Boulanger's Plumbing, Paul Chartier

Boulanger's Plumbing, Paul Chartier

Location

1916 Northampton St., Holyoke, MA 01040

Industry

Educational Facility

Inputs

Project requirements

Deliverables

Plumbing 3D Modeling, Clash Coordination, Shop Drawings, As-Built Documentation

SOFTWARE WE USED
Business Needs

The client required a precisely coordinated plumbing system that integrated smoothly with other MEP and structural components. Given the complexity of the project, they sought a digitized BIM-driven approach for clash-free installations and optimized routing. Tejjy Inc. was chosen for this project due to our proven expertise in MEP BIM services and immense experience in plumbing modeling, and coordination, making us the ideal partner.

The key needs included-

  • Ensuring accurate integration with other building systems namely, HVAC, electrical, and structural elements. 
  • Utilizing BIM (Building Information Modeling) for proactive issue identification and mitigation. 
  • Making sure that the plumbing designs adhered to local building codes and standards. 
  • Optimizing Space Utilization by developing efficient routing strategies within tight mechanical spaces. 
  • Provide precise records for future maintenance and renovations using scan-to-BIM approach for accurate as-built documentation of MEP systems. 
Challenges

There were significant obstacles that arose during the W.R. Peck Middle School project given the function of the site. These issues demanded strategic problem solving along with real-time collaboration with stakeholders.

Some of the key challenges faced by team Tejjy are mentioned below: 

  • While working on this project, the design conflicts and clashes with other building systems were a significant challenge. With no updated as-built data the chances of installation errors and delays were high. A thorough clash detection process was required to mitigate these risks. 
  • Optimizing plumbing pipe layouts within confined mechanical spaces was an intricate task. Our team needed to explore various routing options to find the most space-saving solution.
  • While designing special consideration had to be given to efficient water flow, accessibility for maintenance, and compliance with building codes, which was a challenge due to the space constraints of the facility.
  • Ensuring seamless coordination with structural and HVAC systems was critical to avoiding conflicts during installation. Any misalignment in design or execution could have resulted in on-site inefficiencies.

Outsource your MEP BIM Modeling Services Requirements to Us

Our Solutions & Approach

The W.R Peck Middle School project showcases Tejjy Inc.'s expertise in MEP BIM coordination solutions. Our team utilized Revit 2024 for detailed 3D modeling, Revizto for clash detection, and BIM 360 for real-time collaboration. This digital proficiency helped us proactively identify and resolve conflicts before installation.

Tejjy Inc. Capitalized on their digitized AEC workflows and the expertise in 3D laser scanning and BIM solutions. This approach ensured error-free execution. Our team worked closely with stakeholders to mitigate design conflicts and to streamline the approval process.

Our solutions include 

  • Our proficient team utilized Revit 2024 and Revizto for early clash detection and resolution. This facilitated smooth integration of plumbing systems with other MEP and structural components. This also reduced installation errors and prevented costly on-site modifications. 
  • Tejjy’s in-house team of architects and designers then developed highly detailed and accurate shop drawings that aligned with construction requirements. Their expertise reduced misinterpretations for smooth on-site execution. These Shop drawings provided clear guidelines for the plumbing installation team. 
  • We leveraged BIM 360’s cloud-based environment to facilitate seamless collaboration between trades. This tool allowed instant access to updated models, drawings, and approvals. Our collaborative approach helped streamline communication and reduced delays caused by outdated information. 
  • We designed space-efficient plumbing layouts to navigate tight mechanical spaces. The design was crafted while maintaining accessibility for future maintenance. This ensured that the system remained compliant with industry standards. 
  • Team Tejjy generated precise as-built drawings to reflect the final installed conditions. These documents provided a valuable reference for future maintenance and facility management. 
Business Impact
  • Early clash detection minimized costly rework during installation. 
  • BIM-based collaboration streamlined decision-making across trades. 
  • Optimized workflows led to faster approvals and execution. 
  • Efficient design reduced material waste and unnecessary rework expenses. 
  • Precise documentation ensured smooth project handover with accurate as-builts. 
Project Samples
MEP BIM Coordination services W.R Peck Middle School Holyoke
3D MEP BIM Modeling for W.R. Peck Middle School 1916 Northampton St., Holyoke, MA
MEP Clash Coordination & 3D Modeling for Educational Facility, Holyoke, MA 01040

Complete your construction project on-time & within budget