VDC BIM COORDINATION SERVICES

Optimize Construction Project with VDC BIM Coordination Services in USA

Our VDC BIM coordination services for Architects, Engineers, Fabricators, Contractors and Manufacturers facilitates identifying and resolving hard clashes and soft clashes. Our team ensures inter/intra-disciplinary coordination, clash detection resolution, report generation for MEP, Structural, Architectural model audit. Tejjy coordinators enhance collaborative building design coordination in construction through BIM execution plan and workflow from schematic design to construction documents.

The single coordinated BIM model (MEP, Structural, architecture) primary goal is clash detection reporting, interference management, coordination meetings for design modifications, constructability analysis between design and on-site execution efforts. Tejjy’s BIM coordination services is to streamline construction project logistics and foster an optimized supply chain through reduction in resource wastage.

We deploy the automation plugins for software like Autodesk Revit and Navisworks to clash-free 3D BIM model for your project.

bim coordination services

Our VDC&BIM Coordination Services

Our Accurate Clash-Free BIM Model Coordination Process

  • Initially, Architecture, Structural, MEP (mechanical, electrical, plumbing) model are created as per the client’s project requirements
  • After integrating all disciplines into single model clashes can be detected with BIM coordination software like Autodesk Naviswork BIM Glu 360.
  • Clash identification is reported and resolved as per coordination meeting reviewals in a common data environment
  • Through continuous meetings, reviews and check on common collaborative platform change management is maintained.
Model Coordination and Clash Detection

Benefits of VDC & BIM Coordination Services

Clash-free MEPF Models and Shop Drawings

Virtual design and construction integration in 3d model can improve building model coordination at preconstruction stage.

  • With detailed virtual model better design element and spatial relationships could be visualized bringing in better scheduling and resource allocation.
  • Collaborative platforms allow real-time check and reviews during coordination meetings. This include especially mechanical, electrical contractors, architects, structural engineers.
  • Early clash detection, resolution and continuous interference checks controls risk, rework and cost overrun.
  • Coordination allows constructability review of the design to construction.
  • Detailed as built documentation ensures constructed facility mantches the design specification for maintenance, renovation.
OUR EXPERTISE IN
Commercial Buildings
Commercial Buildings
Educational Institute
Educational Institute
Historic Monuments
Historic Monuments
Hotels and Resorts
Hotels and Resorts
Residential Buildings
Residential Buildings
Train Stations & Airport
Train Stations & Airport

What is VDC Coordination?

Virtual Design and Construction integration in BIM coordination goes beyond design clash detection to holistic project management involvement. Benefit of VDC coordination in model integration improves collaboration, reduces rework for better alignment of design and construction efforts. Tejjy facilitates 4D scheduling, and 5D cost estimation to enhance collaboration among all project stakeholders—architects, engineers, contractors, and owners. The VDC BIM coordination bridges between digital and physical construction minimizing risks through repeated auditing process for clash free models.

    Subscribe to our newsletter to get latest updates