Clash-Coordinated Shop Drawings and Generating Viewpoints of Critical Areas

Clash-coordinated shop drawings Services

Project Overview

Client Profile

Engineering contracting company

Location

Lee District, Fairfax County, Virginia

Industry

Engineering consulting and contracting

Inputs

Mark-up drawings and 3D drawings

Deliverables

BIM modelling for Wet Utilities and Dry Utilities

SOFTWARE WE USED
Business Needs

The client needed Building Information Models for dry and wet utilities plus clash-coordinated shop drawings, they partnered with Tejjy to get: 

  • Building Information Models for dry and wet utilities  
  • Clash-coordinated shop drawings  
  • Viewpoints of critical areas. 
Challenges
  • Uncoordinated markup drawings and basic 2D drawings provided as input
  • Short time-frame to produce deliverables

Outsource your Coordinated Shop Drawings requirements to us

Our Solutions & Approach

Created clash free and coordinated MEPF models with accurate shop drawings for hospital project in Ireland.

The team of BIM experts at Tejjy delivered a set of coordinated and clash-free models with precise shop drawings. Also, Tejjy took a Revit approach for drafting a detailed set of dry and wet utilities drawings. They ensured that the project met the quality benchmarks and the project was delivered within the stipulated timeline. 

  • Tejjy’s BIM specialists initially assessed client inputs.  
  • They used Revit to build accurate and integrated HVAC, plumbing, fire protection, and millwork plans. 
  • The team used Navisworks to create clash detection reports and forwarded them to the customer for approval. 
  • Shop drawings, sections, and BOQs were retrieved from the authorized model. These were supplied in many forms, including PDF, DWG, and RFA. This allowed the client to easily communicate information.  
  • The team ensured accuracy through ongoing quality checks and used the BIM 360 platform to make real-time modifications, allowing clients and teams to view the updated model from any device and location. 
Business Impact
  • Project delivered within the provided deadline of two to three months 
  • 99% First time Right deliverables and preparing the plot for building execution.
  • Cost savings from clash-coordinated models.
  • Reduced reworks by 30%  

    A streamlined structure has also been built for regular update of the project demands.  

Project Samples
Revit MEP BIM Clash Coordinated Model
BIM for mep shop drawings
3D-BIM-model-with-wet-utilities
3D BIM Model with Wet Utilities

Complete your construction project on-time & within budget