HVAC renovation for U.S. Customs and Border Protection Canine Training Center
Project Overview
Client Profile
U.S. Customs and Border Protection Canine Training Center
Location
828 Harmony Hollow Road. Front Royal, Virginia 22630
Industry
Government
Inputs
Site Details from the client
Deliverables
Scanned model of the facility and HVAC renovation design for it on LOD 300 format.
SOFTWARE WE USED
Business Needs
The U.S. Customs and Border Protection required a detailed as-built model of their existing Canine Training Center to plan and execute renovations. The key objective of the project was to ensure full air conditioning throughout the facility.
Challenges
- Accurate capture of the existing building’s structure and layout
- Integrating new HVAC systems into the existing framework
- Ensuring minimal disruption to ongoing training activities during the scanning and renovation process
Outsource your HVAC renovation design requirements to us
Our Solutions & Approach
- Utilized Leica’s 3D laser scanning to reality capture precise measurements and geometries of the existing structure.
- Developed a detailed Revit (LOD 300) and CAD as-built model reflecting current conditions with utmost precision.
- Scheduled scanning and renovation activities to minimize disruption to the center’s operations.
Business Impact
- Enabled informed decision-making and facilitated seamless project management through detailed and precise modeling.
- U.S. Customs and Border Protection with high-quality Revit and AutoCAD models was able to efficiently plan and execute the HVAC renovations.
- Enhanced the facility’s operational efficiency and comfort by implementing a comprehensive air conditioning system.